header

Showing posts with label Zig Zag Love. Show all posts
Showing posts with label Zig Zag Love. Show all posts

Monday, July 14, 2014

Finish Along List for 2014 Quarter 3

After a pretty good Q1, I did terribly in Q2. Zero out of four! I have big hopes for Q3, so here is my probably a tad over ambitious list:


Zig-Zag Love - Here it is, in all its wrinkly glory! This quilt isn't for anyone in particular, which is probably why I lost my sense of urgency! I don't have a deadline on this one, but I still would like to mark it off the list. It isn't doing anyone any good half-quilted!  Status: In the process of quilting.



Lickety-Split Quilt - The backing has been constructed and it is basted. Hopefully will be done by the end of July. Status: Waiting to be quilted.



Snowball Baby Quilt - As you can see, all I have done with this quilt is rearrange the squares into a different configuration so that you wouldn't have to see the same picture twice! :D Would really like to get done by the end of August. Status: Waiting to be turned into snowball blocks.



Quilty Fun - Center part with all the blocks is done. This is also not an urgent project, but if I get it done by the end of the quarter I will be a very happy! Status: Piecing the borders.



Texas Road Trip Quilt - Quadrant 3 has been pieced since the last time I showed this one off. I hope to get get this one done by the final link up in August 17.  Status: Piecing Quadrant 4

On a related note, I would like to think everyone who has entered into the Aurifil Giveway on the Road Trip post. I have learned so many new things and discovered many places that I need to visit!

Linking up with the 2014 Q3 Finish Along at The Littlest Thistle!

Monday, April 14, 2014

Finish Along 2014 Quarter 2 - To Finish List

Hello friends! After my three finishes in February, I haven't done very much sewing. For the whole month of March, it seemed like nothing I sewed was turned out correctly. So I took a little bit of break and I spent as much time outdoors as possible. It has been such great weather for biking! Now I feel rejuvenated and ready to get back into the sewing room! Here is a list of projects I hope to get done this quarter:

Carryovers from Last Quarter:
1) Zig Zag Love - This quilt has come a long way since last quarter! It went from a million pieces to a fully basted quilt. There is another picture of this quilt on Instagram. Status: In the process of quilting.
2) Charley Harper/Botanics Baby Quilt - I didn't make much progress on this quilt, but I did buy the backing material and come up with a quilting plan. Status: Quilt Top, need to piece backing and quilt it.

New Additions:
3) Crimson Cross Quilt - This quilt was the first quilt I started and the last time I wrote about it was on January 25, 2012 (my very first WIP Wednesday!). It is in the exact same stage as it was that day! I didn't realize at the time that 80"x90" was not an ideal size for a first quilt. :D  I am not in love with it, but I do want to check it off my list! Status: Quilt Top, needs to be quilted. I will most likely be sending this one out for quilting.
4) St. Louis 16 Patch - Status: Quilt Top, needs to be quilted. I will be tying this quilt.

There are only four projects on the list, because I am really itching to start a new project too! I'm thinking either Blossom Heart Quilts Bright Sky pattern or Kathreen Ricketson's Step Lively pattern from Little Bits Quilting Bee...or both!

Linking up with the 2014 Finish Along at The Littlest Thistle!

Friday, January 17, 2014

Finish Along 2014 Quarter 1 - To Finish List

Finish Along 2014I want to complete 5 projects for the first quarter of the 2014 Finish Along. Three of those projects are baby quilts, so I think this goal may be attainable! The 2014 Finish Along is being hosted by the fabulous Katy at The Littlest Thistle.  As of this posting, there are still a few more hours to link up (it is closed now).



1.  Charley Harper/Botanics Baby Quilt- This quilt top has been taking up valuable floor space for a month and a half. :) This should be a quick finish. The back will have some simple piecing and I'll be quilting straight lines around the seams. Status: Quilt top is done







Two birds, one stone:
2. Baby Equilateral Triangle Quilt- This quilt for a friend has been on my list for a long time. So long, that the baby is already a year old! Status: The pieces are cut.
3. Baby Plus Quilt - This quilt for my husband's coworker has only been on my list since early last year and the baby is due any day now. I am using the same fabric, so I have been cutting the pieces at the same time. Status: The pieces are cut.



4. Zig Zag Love - There is really no urgency with this one, but I stopped halfway through piecing and I have a mess of 1.5" berry squares all over the place! I want to finish this before I lose all the pieces! Status: Half of the piecing is done.



5. Patchwork Prism - An oldie, but a goodie! I finished this top in October 2012 and it has been tucked away in a drawer ever since! I love this quilt and I really want to use it! My idea for the back has been holding me up. Status: Quilt top is finished.

Hopefully I won't get distracted by any shiny new projects or QALs in the next 3 months. ;) Good luck to all who linked up with the FAL this quarter!
Copyright © From Pixels to Patchwork 2012. All text and images on this blog are property of From Pixels to Patchwork unless otherwise noted. If you link or share anything from this site, please credit me. Thank you!