header

Showing posts with label Mystery. Show all posts
Showing posts with label Mystery. Show all posts

Tuesday, April 30, 2013

WIP Wednesday

I have been focused on two projects for the past couple of weeks:

BP MS 150 Quilt Progress

WIP Wednesday at Freshly Pieced1) BP MS 150 Quilt - My husband rode the BP MS 150 this year. The BP MS 150 is a two-day fundraising cycling ride organized by the National Multiple Sclerosis Society. The ride is a 180-mile journey for MS from Houston, TX to Austin, TX. He trained really hard this year and I am really proud of him! About a week before the ride, I started thinking it would be nice to make him a congratulations/memory quilt. Actually the original idea was a pillow, but once I started brainstorming the project spiraled completely out of control!

The quilt will be Texas & cycling themed. I am using colors from both the BP MS 150 logo and the BP logo. I have no idea how this quilt is going to look in the end, but I am having a lot of fun figuring out what blocks I want to use for it! So far we have a cow, Trail of Geese, bluebonnets, Texas, a patchwork heart and letters. :)

(2) Mystery quilt - (from my FAL list) I am about 40% done with the top. I really want to keep working on it right now, but I have reached the point in the night where my mistakes outnumber my successes!

I hope you all are having a great week!

Monday, April 8, 2013

2013 Finish-A-Long Q2 List

she can quiltIt's time for my 2013 Finish-A-Long Q2 Update! I only finished one out of five projects from my list last quarter, the Starburst quilt. I made progress on the Scrappy TAL, but the other three projects are still sitting in plastic bins. I didn't start any other major projects though, so I count that as progress! The four unfinished projects, plus one new item are on my list for Q2.

  1. Scrappy TAL - I assembled the quilt top, basted and started quilting last quarter.
    Current Status: Need to finish quilting. Target finish date: End of April 2013
  2. Swoon: I was supposed to have to done by Christmas 2012.
    Current Status: Blocks are cut & ready to be pieced.  Target finish date: End of June 2013
  3. Looking Back: All the applique pieces have been cut since the beginning of December. I was also supposed to have this one done by Christmas 2012!
    Current Status: I just need to get to hand sewing! Target finish date: End of June 2013
  4. Flower Girl Quilt: The fabric is washed, ironed, starched & cut.
    Current Status: Need to get to sewing! Target finish date: End of May 2013
  5. Mystery Quilt - This quilt is only a mystery, because I am not sure if it is going to turn out as well as my drawing! I am ready to get this one done, because I have been working on it on and off for almost a year now. Not because it's hard, but I'm easily distracted. :)
    Current Status: All my chain-piecing is done. I need to get to the blocks ready and sew the top. Target finish date: End of April 2013

In other news:
  • The winners of the Pay it Forward contest were #5 & #7 which is Jennifer from Knotted Thread and Rachel from Sew Happily Ever After. Congratulations! You'll be getting a little surprise from me sometime in the next year. Thank you to everyone who entered! I wish I could make something for each of you! 
  • My Girl Friday Sews tutorial will be up on Wednesday, April 10! Be sure to check Fabric Mutt for the blog hop schedule, so you can see all the great tutorials that have already been featured!
Copyright © From Pixels to Patchwork 2012. All text and images on this blog are property of From Pixels to Patchwork unless otherwise noted. If you link or share anything from this site, please credit me. Thank you!