header

Showing posts with label Looking Back. Show all posts
Showing posts with label Looking Back. Show all posts

Wednesday, November 13, 2013

WIP Wednesday

WIP Wednesday at Freshly PiecedHi, friends! I can't believe how much time has passed since my last post! I have been working on a king-sized gift project for the past couple of months and took a mini internet hiatus to avoid distraction (except for Instagram, I can't give up Instagram). It took way longer than I anticipated! The quilt went to the longarmer last week and is already on its way back to Houston. Naturally, I will be spending the next five days repeatedly reloading the USPS tracking page. I hope to be able to share it with you all before the end of the year.


This was my sanity project while working on the gift project. I needed something quick, easy and with a little bit of color. For this quilt top, I used Prairie Paisley II (Minick & Simpson), Blueberry Crumb Cake (Blackbird Designs) and half of Papillon (3 Sisters). I received all these fabrics as part of the Moda Fat Quarter Club at FQS. I never quite knew what to do with these fabrics, but they were all so pretty and soft that I couldn't make myself get rid of them. When they were stacked together, I realized that most of the fat quarters would combine nicely into one quilt!

I looked for a pattern that was a total fat quarter hog and wouldn't require any background fabric purchases. The St. Louis 16 Patch (tutorial by skburton designs) fit the bill! I love how all the fabrics work together and the red just makes this quilt for me. I am going to try to work as many of the scraps as possible into the quilt backing and I will by tying this quilt

Since it is almost 2014 and I figured I ought to get a move on it, I finished the last two blocks for the 2012 Designer Mystery Block of the Month. The block on the left is April Showers designed by Sweetwater and the block on the right is Sunday Drive designed by Polly Minick & Laurie Simpson. How cool is that pinwheel block? I used to dread making pinwheels, but they are now my favorite! Even though the blocks are finished, I have lot of piecing left to do for the sashing and borders.

Besides all that, my cat blocks are quickly multiplying, I started appliquéing leaves down for the Looking Back quilt and within an hour of rejoining the internet I joined the Quilty Fun Sew-Along! How was I supposed to resist that apple block?

Linking up for WIP Wednesday @ Freshly Pieced!

Monday, April 8, 2013

2013 Finish-A-Long Q2 List

she can quiltIt's time for my 2013 Finish-A-Long Q2 Update! I only finished one out of five projects from my list last quarter, the Starburst quilt. I made progress on the Scrappy TAL, but the other three projects are still sitting in plastic bins. I didn't start any other major projects though, so I count that as progress! The four unfinished projects, plus one new item are on my list for Q2.

  1. Scrappy TAL - I assembled the quilt top, basted and started quilting last quarter.
    Current Status: Need to finish quilting. Target finish date: End of April 2013
  2. Swoon: I was supposed to have to done by Christmas 2012.
    Current Status: Blocks are cut & ready to be pieced.  Target finish date: End of June 2013
  3. Looking Back: All the applique pieces have been cut since the beginning of December. I was also supposed to have this one done by Christmas 2012!
    Current Status: I just need to get to hand sewing! Target finish date: End of June 2013
  4. Flower Girl Quilt: The fabric is washed, ironed, starched & cut.
    Current Status: Need to get to sewing! Target finish date: End of May 2013
  5. Mystery Quilt - This quilt is only a mystery, because I am not sure if it is going to turn out as well as my drawing! I am ready to get this one done, because I have been working on it on and off for almost a year now. Not because it's hard, but I'm easily distracted. :)
    Current Status: All my chain-piecing is done. I need to get to the blocks ready and sew the top. Target finish date: End of April 2013

In other news:
  • The winners of the Pay it Forward contest were #5 & #7 which is Jennifer from Knotted Thread and Rachel from Sew Happily Ever After. Congratulations! You'll be getting a little surprise from me sometime in the next year. Thank you to everyone who entered! I wish I could make something for each of you! 
  • My Girl Friday Sews tutorial will be up on Wednesday, April 10! Be sure to check Fabric Mutt for the blog hop schedule, so you can see all the great tutorials that have already been featured!

Sunday, January 13, 2013

First Quarter 2013 Finish-A-Long List

Edit: These project sheets are now available for download at this link. Thank you!


she can quilt
I've spent a lot of time this past week getting all my projects organized and figuring out what projects I have going on and what stage they are in. I have way too many projects that are stuck in the cutting phase! Most of my projects for this quarter have been cut for a long time. I just need to sew them together. My five hopeful finishes are listed below:



1) Scrappy Trip Along: The quilt I started this month is closer to being finished than quilts I started months ago! I wasn't going to make this quilt at first, but Instagram pictures have a hypnotic effect on me. My rationalization for starting this quilt is that I want to improve my quilting skills this year and this would be a great quilt to try orange peel quilting on. 
Current Status: Strips are cut and 12 out of 30 blocks complete. Target finish date: End of January 2013



2) Looking Back: Husband request #1. There is a lot of hand sewing on this quilt, so this will be my nighttime project. I was supposed to have this one done by Christmas 2012!
Current Status: All the applique pieces have been cut since the beginning of December. I just need to get to sewing! Target finish date: End of February 2013



3) Swoon: Husband request #2, for Aunt. This is another one I was supposed to have to done by Christmas 2012.
Current Status: Blocks are cut & ready to be pieced.  Target finish date: End of February 2013


4) Starburst QAL: This QAL just started over at Happy Quilting. I ordered 4.5 yards of Quilter's Linen in Midnight for another project, but it wasn't dark enough. I figured this would be a great opportunity to use it!  
Project Stage: This is the newest project on the list. Fabrics are chosen and being cut. Target finish date: March 4, 2013


5) Flower Girl Quilt: Husband Request #3, for one of his friends that is expecting. I'm going to divide this kit up into a few smaller quilts. I haven't decide whether to use four or nine flowers for the quilts. Four would be a more standard, but nine would allow longer usage. I'll decide after I finish sewing the flowers!
Current Status: The fabric is washed, ironed, starched & cut. Well, most of it! This project ended up in limbo because I messed up on the cutting of 2 fat quarters. I need to order some more. Target finish date: End of March 2013




So: one quilt for January, two for February and two for March. Here is to getting my projects out of plastic containers and onto beds :). My plan for tomorrow is to mark the the appropriate Flower Girl pieces and to sew 8 more Scrappy TAL blocks. 


Also Linking Up With:
  Plum and June
Copyright © From Pixels to Patchwork 2012. All text and images on this blog are property of From Pixels to Patchwork unless otherwise noted. If you link or share anything from this site, please credit me. Thank you!